This project is located at Chinawaltair area adjacent to Andhra University, Visakhapatnam a think tank place.

Abhiram Nirman is always in the fore front in inventing a new concept of tailor made house for a group of people of like minded and what that locality demands, and thus conceived a mini gated community in 3808.16 Sq. Yards, just on the Main Road passing from Siripuram to VUDA Park and a few meters to reach The Park Hotel Beach that caters 60 families in “Abhiram’s Blue Bay Towers”, in the posh area of High Class preferred locality.

Project Highlights

World Class Aminities
  • GVMC- approved Project
  • 5 Floors
  • 60 Luxury Apartments
  • A few meters away to Park Hotel Beach
  • 3 BHK & 2 BHK Flats
  • East & West Facing Flats only
  • 1125 Sft, 1470 Sft, 1475 Sft, 1790 Sft areas
  • Super Deluxe Construction
  • 100% Vaastu Compliant
  • Siripuram to VUDA Park Main Road
  • 24/7 Security with Intercom and CC Cameras.
  • 3 lifts of 6 passengers Capacity.
  • No. common walls
  • Tot-Lots
  • Generator backup for Common Areas
  • Reputed Builder.

Structure

Earthquake resistant RCC framed structure designed to withstand wind and seismic loads.

Super Structure

External walls & internal walls will be (6”) and (4 ”) walls as specified by our architects.

Main Door

Main door frames of Teak wood and Teak paneled shutter with melamine polishing & Good Quality of Hardware of the standard brand.

Internal Doors

Well seasoned wooden frames with water proof flush door shutters, with good quality hardware.

Windows

UPVC windows by standard company with glass panel.

Kitchen

Polished Black granite platform with superior stainless steel sink. 3 ft glazed tile dado above kitchen platform.

Living Dining

800 mm X 800 mm size vitrified tiles with skirting of the standard brand.

Bedrooms and Kitchen

600 mm X 600 mm size vitrified tiles with skirting of the standard brand.

Interior

Two coats of putty finish, primer coat, 2 coats of good quality emulsion paint.

Exterior

Weather – proof emulsion paint based on the finalised elevation

Lifts

Three lifts of Johnson or equivalent make.

Brick Work was completed

Updated on 29th December 2018